As Construction Concludes, we prepare for a new era of quality
senior healthcare service to Chattanooga.
Stop by and see us.
July 5, 2007: Ready for furniture Delivery...
Cubical Installation underway Main Lobby Reception Desk Installed.
View of Connector to Siskin Hospital (left) and side view of finished exterior (right)

June 11, 2007: Building Dedication (Photos Courtesy of Wesley Schultz)

May 19, 2007 May Aerial Shot
May 17, 2007 The difference a few hours makes...

May 15, 2007 Exterior Panel Install Begins...
May 14, 2007
Dining/Activity Flooring Installed View Hallway Floor Finishes
May 4, 2007: Finish Work Well Underway
Ceiling Grid ready for tiles in Parking Garage (Right) Recessed Lighted Coves on First Floor
Resident Bathroom Cabinetry Resident Room Dresser and Desk Area
Hallway flooring installation underway 2nd Floor Nursing and Community Gathering Area
April 24, 2007
Green Green "Grass" of Home? (R) Day Spa Flooring Installed Today
First View of Coves on First Floor Ceiling!
April 19, 2007 Flooring install begins...

April 17, 2007
Bathroom accessory installation well underway... Door hanging commences today.
April 12, 2007
Shower / Whirlpool Room Tile Installation This is Blaine from Liberty Enterprises wanting to
give a shout out to all of his internet fan base.
April 10, 2007
Glass added to Vestibule Entryway Dirt Added for Front Landscaping
April 4, 2007
Window Mullions Added to Entryway Celing Grid Begins in Patient Rooms
Departmental Leadership gets first glimpse.
March 22, 2007
Paint finishes begin. Tile to resident bathrooms.
March 19, 2007: Aerial Photo

March 7, 2007
View of the storefront installed Elevator car being assembled
View of Windows on Adminstrative Floor
2nd Floor Wall "Mudding" underway
February 26, 2007
View of Nursing Home in reflection of the windows of Siskin Hospital
February 22, 2007
(L) Storefront installed to activity/dining (R) Preparing to pave under the connector
areas
February 19, 2007: Aerial shot
February 11, 2007: Connector structural steel in place!
(L) View from back of 1st floor through to the hospital; (R) View of connector from ground
February 8, 2007
(L) Elevator installation underway; (R) Entryway curb and gutter forms in place
February 7, 2007
(L) C-Channels in place to elevate floor for connector to hospital; (R) Radius hallway walls take shape
January 22, 2007: Let the drywalling begin...

January 20, 2007: Aerial shot

January 18, 2007
Glass in place on both sides of sequence #1
January 17, 2007
Drywall delivered to all rooms in Seq. #1
January 15, 2007
Roof fully installed and glass commenced on second floor
January 10, 2007
(L) Window rrames stacked for install; (R) First frames installed in Seq. #1
January 2, 2007
Exterior sheeting to front of building Sun rises on new roof to Seq. #1
December 15, 2006:Aerial photographs
READY FOR GLASS
December 11, 2006
Densiglass installation commences Typical conduit for one pt. room wall
December 6, 2006
View of completed roof and air units Core drilling for plumbing
View of main elevator shaft Glass arrives!
November 22, 2006: A view from the roof... only a few planks remaining
November 21, 2006: Aerial Shot, roof install in progress...

November 20, 2006: "Roof Week"
Concrete pour to parking deck Setting roof planks to 3rd floor
View from Sequence #1 Patient floor central lobby area
November 6, 2006
Sequence #1 roof started; (R) Serpentine cooridor wall track added to ceiling.
November 2, 2006
Sequence #1 roof installed Sequence #3 topping poured
(L) First floor administrative offices (R) Exterior radius wall
October 26, 2006
3rd floor completion Final pieces placed
October 20, 20006: Aerial shot shows completed 1st and 2nd floors and partial 3rd floor installed

October 18, 2006
First floor offices take shape Front entrance curb ready to pour
October 13, 2006
(L) Marking the radius (curved) walls in the first floor connector
(R) Installing the first set of pan stairs in Sequence #3 stairwell
Forming curved radius in front entryway Third floor Seq. 2 hollowcore install
October 11, 2006
Sequence #3 metal stud commences; (R) Edge angle connects sequence 1 & 2 third floor
October 9, 2006
Pouring 2" topping on first floor; (R) Spraying fireproofing exposed beams above 1st floor parking deck
October 3, 2006
Third floor added to Sequence #1 Sequence #2 stud work continues
September 28, 2006
Second floor hollowcore complete; (R) Sequence #1 load-bearing metal stud progress. Sequence #2 has started, as well (upper left)
September 25, 2006
Test panel of the exterior finish
September 20, 2006: Aerial Shot
Edge angle added to Sequence #3 2" topping poured on Seq #2
September 13, 2006
Load-bearing metal stud work begins on 2nd floor and hollowcore added to Seq. #2
September 11, 2006
(L) Edge detail added to Sequence #3: (R) Load-bearing stud ready on second floor
September 7, 2006
View from 2nd floor (w/topping poured); (R) View from back of 1st floor (ductwork started)
August 31, 2006
Stairway "pans" delivered Blocking the ground floor, Sequence #1
August 26, 2006
Adding temporary stairs to Sequence #1
August 25, 2006
Hollow core placement continues; (R) Close up view of 1st floor parking entrance
August 24, 2006
Edge detail "The Wave" added to 2nd floor Sequence #2 hollowcore installed
August 18, 2006
August Aerial Shot
August 17, 2006
2nd floor hollowcore in Sequence #1 Steel work continues on Sequence #3
August 16, 2006
Second floor taking shape
Retaining wall around Sequence #3
August 11, 2006
Hollowcore finished in Seq. #1 Structural Steel Completed Seq. #2
August 10, 2006
View into office area (from road) Sequence #2 steel commences
August 9, 2006
HOLLOWCORE CONCRETE ARRIVES FOR THE FLOORS! Sequence #1
The first hollowcore plank is installed Hollowcore for 1st floor
August 7, 2006
HOT! High of 95 today. Fan and shade to provide relief; (R) Finishing stone backfill
The steel garden Ground floor pours start
August 4, 2006
Sequence #2 structural steel taking shape; (R) "Keystone" retaining wall around Seq. #2
View of Sequence #2 in progress (note columns by retaining wall): (R) Steel with concrete wraps in Sequence #1
August 3, 2006
Compressing block behind retaining wall; (R) Setting keystone block retaining wall
Side View of Section #2 steel erection; (R) Columns prepped for concrete (Sec. #1)
July 27, 2006
View up the Seq. #1 stairwell; (R) Main elevator blockwork in progress
Waterproofing retaining wall
July 26,2006
View of "Sequence 1" from construction trailer. Stairwell complete to roof access.
July 24, 2006
View of Sequence 1 steel work from the hospital connector location; (R) Mason work begins with the "cornerstone" placed.
July 21, 2006
Sequence 1 structural steel continues; (R) Pouring footing for main elevator bank - 100 yards!
July 20, 2006: The building starts to take shape

July 19, 2006: STRUCTURAL STEEL ARRIVES!
Transformer set in place Steel arrives on flatbed Beams unloaded by crane
First pieces of steel are erected
July 18, 2006: Aerial photo of site

July 14, 2006
Paving north side of site to use as a laydown area througout construction
July 10, 2006
(L) Poured retaining wall completed; (C) Sequence #2 spread footings start
July 7, 2006
(L) Marking footing location for 2nd elevator pit; (C) Spread footings in bottom of "T" ready for structural steel; (R) Pouring retaining wall: 77 yards of concrete (gross weight: >127 tons!)
July 3, 2006
(L & C) Forms being installed for west retaining wall (16 feet high)
(R) Yes, hot day today...find the shade wherever you can...
June 29, 2006
(L) Digging the "fire pit" (water connection); (C) Elevator support columns;
(R) Inside a typical spread footing pit.
June 28, 2006
Footer poured for retaining wall.
June 27, 2006
Preparing to pour the footing for the retaining wall on the west (front) of the building
June 21, 2006
(L) Preparing for spread footings: (C) Re-bar ready for installation in
spread footings; (R) New opened parking lot in use on southeast corner
June 16, 2006: "If you pave it...they will park"
New outpatient parking area will ease congestion with additional 41 spaces during
construction; (R) Re-bar unloaded for spread footings as retaining wall excavation continues in background
June 15, 2006: North side parking paving day!
(L) 2" Binder core is installed for Siskin Hospital parking during construction of building
(R) Further excavation on hillside for the main retaining wall location.
June 8, 2006
(L) Undercut holes compressed with remote control roller; (C) 6" of "PUG" rock installed in prep for asphalt; (R) More unsuitable soils require undercutting and replacement with rock
June 5, 2006
Rig for digging GeoPiers (#136 to drill). Augur bit (R) used to drill hole
approx 20 ft deep, then rock inserted and power tamped down in 1 foot
high sections until ground level reached. The spread concrete footings will
essentially rest on these columns ("piers") of compressed rock.
June 1, 2006
(L) Typical layout for GeoPier footings: (R) Trench for roof drains
May 30, 2006
Unsuitable soils were encountered on buliding pad; need to "undercut" and replace with fill stone. (R) Example of undercut "pit" shown in photo
May 23, 2006
A level bulding pad is prepped for deep foundations; (R) Remaining dirt removal
May 15, 2006
Utility sitework continues; (R) Valet parking staff ready to assist patient parking needs with a smile
May 10, 2006
(L) Storm drains are installed; (R) A construction progress poster is mounted to keep
the residents/staff informed of the sights and development
May 5, 2006
(L) Site leveling progress; (R) Gravel hauled in for storm drain installation over the weekend
May 3, 2006
Backfill begins to level the surface; (R) Site utility materials moved into place for install
(L) Striping the entry drive to the hospital to improve traffic flow; (R) Site leveling continues
May 1, 2006
Primary cut now runs the full length of the front facade of the building
April 28, 2006
Southwest excavation contines; (R) Site utility manholes ready for install
April 26, 2006
Excavation begins Cut is started on southwest corner
April 24, 2006
Parking lot removal is completed, job sign is posted.
April 20, 2006
Additional parking added to ease congestion April 19, 2006
Aerial shot of construction site
April 17, 2006
Parking lot extraction begins...
April 12, 2006
Siskin Hospital parking lot is prepared for the excavation stage
Electric Power Board grants temporary easment for construction parking and laydown area across the street from the construction site
Click here for Groundbreaking Overview (March 15, 2006) (.pdf)
|